About

A highly effective and accountable Senior Project Manager PMP, with a proven track record…

Articles by Jesse

Activity

1K followers

See all activities

Experience & Education

  • GNB Global Inc.

View Jesse’s full experience

See their title, tenure and more.

or

By clicking Continue to join or sign in, you agree to LinkedIn’s User Agreement, Privacy Policy, and Cookie Policy.

Licenses & Certifications

Volunteer Experience

  • Boy Scouts of America : Denver Area Council Graphic

    Eagle Scout

    Boy Scouts of America : Denver Area Council

    - Present 32 years 3 months

    Disaster and Humanitarian Relief

    Built a Handy-Cap access gates to a pond so that disabled people could visit the local ponds and they could still ensure that vehicles weren't able to drive on the grass causing erosion.

  • Concerned Citizen

    Comunity Preservation

    - Present 30 years 5 months

    Social Services

    Filled and distributed sand bags for impending flood victims due to a heavy spring thaw runoff in Sheridan, WY.

  • Volenteer Shark Wrangler

    Shark Rodeo

    - 2 years 10 months

    Animal Welfare

    Catch and release of all types of sharks in the Gulf of Mexico. This activity included tagging and fin clip retrieval so that the shark migratory patterns could be tracked though out the life of the sharks.

  • Automotive Waste Recycling

    Community Recycling

    - Present 9 years 10 months

    Social Services

    Helped organize efforts to take in household wastes in the form of used tires and other automobile wastes for recycling free to the public.

Publications

  • Emissions, Monitoring, and Control of Mercury from Subbituminous Coal-Fired Power Plants - Phase II

    DOE

    ABSTRACT Western Research Institute (WRI), in conjunction with Western Farmers Electric Cooperative (WFEC), has teamed with Clean Air Engineering of Pittsburgh PA to conduct a mercury monitoring program at the WEFC Hugo plant in Oklahoma. Sponsored by US Department of Energy Cooperative Agreement DE-FC-26-98FT40323, the program included the following members of the Subbituminous Energy Coalition (SEC) as co-sponsors: Missouri Basin Power Project; DTE Energy; Entergy; Grand River Dam Authority;…

    ABSTRACT Western Research Institute (WRI), in conjunction with Western Farmers Electric Cooperative (WFEC), has teamed with Clean Air Engineering of Pittsburgh PA to conduct a mercury monitoring program at the WEFC Hugo plant in Oklahoma. Sponsored by US Department of Energy Cooperative Agreement DE-FC-26-98FT40323, the program included the following members of the Subbituminous Energy Coalition (SEC) as co-sponsors: Missouri Basin Power Project; DTE Energy; Entergy; Grand River Dam Authority; and Nebraska Public Power District. This research effort had five objectives: (1) determine the mass balance of mercury for subbituminous coal-fired power plant; (2) assess the distribution of mercury species in the flue gas (3) perform a comparison of three different Hg test methods; (4) investigate the long-term (six months) mercury variability at a subbituminous coal-fired power plant; and (5) assess operation and maintenance of the Method 324 and Horiba CEMS utilizing plant personnel.

    See publication
  • Pilot Testing of WRI's Novel Mercury Control

    DOE

    ABSTRACT The challenges to the coal-fired power industry continue to focus on the emission control technologies, such as mercury, and plant efficiency improvements. An alternate approach to post-combustion control of mercury, while improving plant efficiency deals with Western Research Institute's (WRI)'s patented pre-combustion mercury removal and coal upgrading technology. WRI was awarded under the DOE's Phase III Mercury program, to evaluate the effectiveness of WRI's novel thermal…

    ABSTRACT The challenges to the coal-fired power industry continue to focus on the emission control technologies, such as mercury, and plant efficiency improvements. An alternate approach to post-combustion control of mercury, while improving plant efficiency deals with Western Research Institute's (WRI)'s patented pre-combustion mercury removal and coal upgrading technology. WRI was awarded under the DOE's Phase III Mercury program, to evaluate the effectiveness of WRI's novel thermal pretreatment process to achieve >50% mercury removal, and at costs of

Patents

  • Efficient Low Rank Coal Gasification, Combustion, and Processing Systems and Methods

    Filed US 20120056431

    Efficient systems for processing fossil fuels such as low rank coal in combustion and gasification systems to remove volatile metals and other pollutant generating species in the fuel as well as provide system schematics which improve the efficiency and quality of the processing systems.

    Other inventors
    See patent
  • Biological Clean Fuel Processing System and Methods

    Filed US 20120003705

    Methods and systems to achieve clean fuel processing systems in which carbon dioxide emissions (1) from fossil fuel consumption sources (2) may be processed in at least one processing reactor (4) containing a plurality of chemoautotrophic bacteria (5) which can convert the carbon dioxide emissions into biomass (6) which may then be used for various products (21) such as biofuels, fertilizer, feedstock, or the like. Sulfate reducing bacteria (13) may be used to supply sulfur containing compounds…

    Methods and systems to achieve clean fuel processing systems in which carbon dioxide emissions (1) from fossil fuel consumption sources (2) may be processed in at least one processing reactor (4) containing a plurality of chemoautotrophic bacteria (5) which can convert the carbon dioxide emissions into biomass (6) which may then be used for various products (21) such as biofuels, fertilizer, feedstock, or the like. Sulfate reducing bacteria (13) may be used to supply sulfur containing compounds to the chemoautotrophic bacteria (5).

    Other inventors
    See patent

Projects

  • T-6 Tower/Column Replacement

    This project included the prefabrication of a replacement T-6, inspection, and turnaround planning to be completed prior to mid March in preparation for turnaround execution at the end of April. During the April/May 14 day turnaround, the old T-6 had to be cleared, cut loose for extraction, and finally lifted out of location. The new tower was fabricated and delivered to site a minimum of a month prior to the turnaround to allow for the tower to be dressed out with piping, platforms, and…

    This project included the prefabrication of a replacement T-6, inspection, and turnaround planning to be completed prior to mid March in preparation for turnaround execution at the end of April. During the April/May 14 day turnaround, the old T-6 had to be cleared, cut loose for extraction, and finally lifted out of location. The new tower was fabricated and delivered to site a minimum of a month prior to the turnaround to allow for the tower to be dressed out with piping, platforms, and instruments. After the old T-6 was removed, the new T-6 with upgraded coatings, metallurgy, trays, and instruments was installed and reconnected to process.

    This project was under a tight deadline, and numerous logistical issues that couldn't have been overcome with out the amazing support that I received from the Process and Production Engineers as well as the flawless execution of the turnaround.

    Other creators
  • Upgrade POX MDEA Purification

    This project entailed installing an Ion-Exchange system from Eco-Tec to remove heat stable salts from the MDEA system. Value add Engineering of this project entailed slight modifications to the process letter tie points to eliminate the requirements for additional heat exchangers and booster pumps. After full review of this project during the initiation stages the overall project plan only encountered one miss step in the specifying of intrinsically safe instead of explosion proof instruments…

    This project entailed installing an Ion-Exchange system from Eco-Tec to remove heat stable salts from the MDEA system. Value add Engineering of this project entailed slight modifications to the process letter tie points to eliminate the requirements for additional heat exchangers and booster pumps. After full review of this project during the initiation stages the overall project plan only encountered one miss step in the specifying of intrinsically safe instead of explosion proof instruments. The total number of effected instruments was minimal and the project was delivered, commissioned, and initiated on time with the budget intact.

    Other creators
  • HE-1222 Replacement

    Replace HE-1222 with material selection upgrades to account for high chlorides in the cooling water stream, re-pipe cooling water circuit to place control valve on outlet, install purge piping for the flow transmitter, and execute this in a one month window from concept to reality and a 12hr shutdown window for install. While in concept this was not a difficult project, the timing windows made this a challenging endeavor. Project was delivered early and under budget.

    Other creators
  • Cascade Cooler Referbishment with Zirconium First Pass

    This project started off as a refurbish in situ project. Recognizing that the budget was insufficient to cover the total labor, I revamped the scope to be a fabricate and replace project. This took the project from being the critical path for execution during a turnaround to just being part of the critical path. At the same time, and even with having to pay for a re-tubing of half of it, the project came in under budget and on time. The execution of this project was truly a team success and not…

    This project started off as a refurbish in situ project. Recognizing that the budget was insufficient to cover the total labor, I revamped the scope to be a fabricate and replace project. This took the project from being the critical path for execution during a turnaround to just being part of the critical path. At the same time, and even with having to pay for a re-tubing of half of it, the project came in under budget and on time. The execution of this project was truly a team success and not just a person conquest.

    Other creators
  • Storm Water Sump Station

    This project entailed excavation, Poring the foundation, and Connection of the electrical. In this location it was extremely difficult to perform the necessary functions due to a high amount of underground utilities that were the main feed lines to the active plant. This project went through multiple major scope changes due to this and still came within the budget allowances, but suffered time slip. The only cost that were associated with the time slip extending over the fiscal year deadline…

    This project entailed excavation, Poring the foundation, and Connection of the electrical. In this location it was extremely difficult to perform the necessary functions due to a high amount of underground utilities that were the main feed lines to the active plant. This project went through multiple major scope changes due to this and still came within the budget allowances, but suffered time slip. The only cost that were associated with the time slip extending over the fiscal year deadline however, were for final hook up and activation.

    Other creators
  • WRI's Pre-Combustion Mercury Removal Process Demonstration

    Process 40 tons of Lignite coal and 40 tons of subbituminous coal through WRI's Mobil Pilot plant, WRI's PDU Mercury Removal Plant, and Southern Researches Oxy-Fired Coal Combustion Facility.

    Other creators
  • Waste Heat Boiler Replacement/Refurbishment

    -

    Operations found a cooling water leak in one of their waste heat boilers. The emergency project was initiated and planned to replace the A train waste heat boiler. After conducting a root cause analysis, the B trains reliability was brought into question as it had experienced the same root cause. I started refurbishment of the inoperable spare that was being stored on site in parallel. The plant took a mini outage for the replacement of A train WHB. Due to practiced precision, the exchange when…

    Operations found a cooling water leak in one of their waste heat boilers. The emergency project was initiated and planned to replace the A train waste heat boiler. After conducting a root cause analysis, the B trains reliability was brought into question as it had experienced the same root cause. I started refurbishment of the inoperable spare that was being stored on site in parallel. The plant took a mini outage for the replacement of A train WHB. Due to practiced precision, the exchange when off well even considering the reduced duration. Shortly before the next scheduled turnaround the B train WHB failed. I was able to fast track the refurbishment of the A train prior to completion of the inoperable spare and thus financially and duration justified, we changed plans midway through. Both projects were completed on time and on budget. These are a success in my opinion due to the emergency nature and lightning fast response time that was afforded.

    Other creators
  • Major Capital Fixed Equipment Replacements During 2019 Turnaround

    -

    During this effort, a separation column was replaced with significant improvements, a heat exchanger was replaced with an entirely new design, Four heat exchangers were replaced in kind, tie-ins were installed for a MOTT filter instillation, two shift and one methanator catalysts were changed, Two waste heat boilers were changed (5 months early due to premature failure without negative consequences). Along with discoverable TA capital that was handled without timeline disruption, a total of $8M…

    During this effort, a separation column was replaced with significant improvements, a heat exchanger was replaced with an entirely new design, Four heat exchangers were replaced in kind, tie-ins were installed for a MOTT filter instillation, two shift and one methanator catalysts were changed, Two waste heat boilers were changed (5 months early due to premature failure without negative consequences). Along with discoverable TA capital that was handled without timeline disruption, a total of $8M of capital work was performed during a $20M maintenance outage. Through the close work with the turnaround team and a focus on risk mitigation early on, these projects were executed on time and on budget with minimal impact to the turnaround logistics and no effect on turnaround budget.

  • Third Party Supply Gas Guard Bed Instillation

    -

    After selecting the most cost effective solution that yielded the greatest performance a dedicated sorbent bed was chosen to be implemented in order to remove trace contaminants from a third party supply gas. In January of 2017 the capital funds were requested and fabrication was initiated in February of 2017. In parallel paths the evaluation and construction of the foundation was initiated. In March of 2017 the Geotechnical survey, coupled with the intent to not require confined space for…

    After selecting the most cost effective solution that yielded the greatest performance a dedicated sorbent bed was chosen to be implemented in order to remove trace contaminants from a third party supply gas. In January of 2017 the capital funds were requested and fabrication was initiated in February of 2017. In parallel paths the evaluation and construction of the foundation was initiated. In March of 2017 the Geotechnical survey, coupled with the intent to not require confined space for construction, dictated that the foundation be placed on a piling foundation. In order to maintain schedule and with a minimized increase to the budget, helical piles were chosen to anchor the foundation. These piles were installed in a day versus the 2 weeks that would be required for slip form piles, and the design allowed for the use of four helical piles versus the nine slip form piles. The guard bed was brought online in the end of July of 2017.
    Overall, this project from recognizing the issue until completion took 1.75 years, and the addition of the dedicated sorbent bed is projected to save Oxea approximately 36-60 rail cars worth of product per year in recouping potential lost sales. In this, the predicted life span of the supply gas contaminant sorbent bed is 3 years and monitoring test product quality through statistical process control (SPC) has confirmed the effectiveness of the online sorbent bed and will serve as a means of monitoring potential breakthrough.

    Other creators

Honors & Awards

  • Eagle Scout

    Boy Scouts of America

    At the age of 15, I obtained the rank of Eagle in Boy Scouts

  • Black Belt

    Tae Kwon Do

    I started Tae Kwon Do for personal defense when I was 6 years old. In continuing the path to this belt, I learned that it had to do with a more over sense of self and how we conduct ourselves in this world rather than strictly a method to defend one's self.

Languages

  • Spanish

    Elementary proficiency

  • Korean

    Elementary proficiency

  • German

    Elementary proficiency

Recommendations received

View Jesse’s full profile

  • See who you know in common
  • Get introduced
  • Contact Jesse directly
Join to view full profile

Other similar profiles

Explore top content on LinkedIn

Find curated posts and insights for relevant topics all in one place.

View top content

Add new skills with these courses